Backfilling operations are currently underway in our Al-Quds Project, aiming to prepare the site and reach the required elevation level for fence foundation construction.
The work is being carried out using approved materials, with compaction testing performed to ensure soil stability and compliance with engineering standards prior to starting concrete works.
This stage forms a crucial part of the site’s infrastructure, laying a solid foundation for the structural integrity of the boundary elements.